Red Line: Longfellow Bridge Work

For the past couple of weeks, Red Line trains have been ordered to slow to a crawl while crossing the Charles River, due to concerns over railroad tie deterioration on the bridge. I’m a bit nervous about this, especially since the T has decided to make emergency repairs (without calling them that).

Pesaturo said the ties were scheduled to be replaced during the rehabilitation of the Longfellow Bridge, “but MBTA staff has decided to accelerate the schedule.”

[From the Somerville Journal.]

I’ve seen how slowly the trains have been running from the Harvard Bridge (Mass Ave), but hadn’t actually ridden one until yesterday.  They really are crawling.  The “accelerated schedule” means the Red Line will be shut down on June 14-15 and 21-22.

Related Posts:


Green Line Extension Moving Ahead


Operator 65891


Service on the Silver Line bus anything but 'rapid transit'


Boston teen to win award for transit work

(Comments are closed)