Orange Line Update

Though the Orange Line is not grade separated from cross traffic, it does receive numerous priority treatments.

Six years after its opening, the Metro Orange Line in Los Angeles remains one of the few true BRT corridors in the United States. Right of way is almost entirely an exclusive busway, and buses receive well-enforced signal priority against cross traffic.

The 14 stations along the 14 mile route currently see approximately 24,000 weekday boardings. A second branch, from Canoga Station in the west north to Chatsworth, will be opening in June 2012. Though only one service currently operates along the route (serving all stops between Warner Center and North Hollywood), the extension will lead Metro to consider other services, such as north-south between Chatsworth and Warner Center. A limited-stop service to the North Hollywood Red Line station might also make sense, given that there are passing lanes at stations and peak headways, currently at 4 minutes, will be high enough to support such service after the extension opens. Though given Metro’s propensity for simplifying service patterns, like the elimination of Metro Rapid Express 920, this seems unlikely. Pictures from a January ride are included below, as is a Measure R construction update on the extension.

Related Posts:

Switching to Public Transit

Props to Metro Rapid

Spike in Transit Ridership

Congestion Pricing and Anti-Sprawl Legislation

Leave a Reply

Your email address will not be published. Required fields are marked *